Bridge River Domestic Water System
Bridge River Domestic Water System Improvements
The Bridge River Domestic Water System Upgrades involved the construction of a new concrete reservoir, water treatment plant with UV disinfection and chlorination, three pressure reducing valve stations, and 2.2 kilometers of HDPE watermain to connect the upper and lower village water systems. Cumming Construction built the reservoir, water treatment plant, and the PRV stations with our own forces. The project was completed in 2017.
Project Info
Client: Bridge River Indian Band
Location: Lillooet, BC
Value: $2,350,000